ITESAL 61 EVO (Mill Finished)
ITESAL Upfront Carbon Emissions
kg CO2e / m2 (A1-A3)
kg CO2e / m2 (A1-A3)
80.90
This data has been generated from publicly available EPD data.
Upfront Carbon Emissions is a summation of Fossil, Biogenic and Land Use emissions. It does not include biogenic sequestration. This is consistent with NABERS database.
Valid until: 7 June 2027
Upfront Carbon Emissions is a summation of Fossil, Biogenic and Land Use emissions. It does not include biogenic sequestration. This is consistent with NABERS database.
Valid until: 7 June 2027
Do you have any questions on this data?
Please contact us
Please contact us
Aluminium sliding window system, mill finished, with thermal break and insulating glass unit, for façade openings.
Product specifications
Material
Aluminium
Finish
Mill finished
Pricing
Availability
In Stock
Countries
ES
Downloads

Environmental Product Declaration
PDF • 1.4MB
About ITESAL
Our company covers a wide range of activities related to aluminium. Specifically, in our factories in Pina de Ebro, Zaragoza (Spain) we produce all types of profiles for use in architecture and industry. We use different alloys for extrusion, our integral lacquering process holds all kinds of certifications, even the most demanding, assemblies of systems for architecture such as BTB (Break of Thermal Bridge), cutting and adaptation to the requirements of each customer as well as special packing and packaging according to their needs. Hence, we have to add a comprehensive logistics and distribution system to our warehouses throughout Spain and abroad, so that the product arrives in perfect condition.
Phone
+34 976 16 64 91
Similar Products

Door panel, Glass - aluminium frame , ITESAL 128 ELV aluminim door coated
82.66
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
N/A
NABERS average

ITESAL 45 (Mill Finished)
92.20
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
N/A
NABERS average

ITESAL 54 SLIM (Mill Finished)
98.50
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
N/A
NABERS average

ITESAL 54 (Mill Finished)
99.00
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
N/A
NABERS average

ITESAL 61 (Mill Finished)
102.90
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
N/A
NABERS average

ITESAL 65 (Mill Finished)
108.50
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
N/A
NABERS average

ITESAL 72 HO (Mill Finished)
109.40
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
N/A
NABERS average

ITESAL 71 (Mill Finished)
112.10
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
N/A
NABERS average