Manufactured Sand
Holcim Upfront Carbon Emissions
kg CO2e / tonne (A1-A3)
kg CO2e / tonne (A1-A3)
6.00
This data has been generated from publicly available EPD data.
Upfront Carbon Emissions is a summation of Fossil, Biogenic and Land Use emissions. It does not include biogenic sequestration. This is consistent with NABERS database.
Valid until: 16 May 2026
Upfront Carbon Emissions is a summation of Fossil, Biogenic and Land Use emissions. It does not include biogenic sequestration. This is consistent with NABERS database.
Valid until: 16 May 2026
Do you have any questions on this data?
Please contact us
Please contact us
Manufactured sand produced by crushing rock, used as a fine aggregate in construction.
Product specifications
Material
Stone
Pricing
Availability
In Stock
Downloads

Environmental Product Declaration
PDF • 1.4MB
About Holcim
Holcim Australia is a leading supplier of construction materials in Australia, providing aggregates, sand, ready-mix concrete, engineered precast concrete, and prestressed concrete solutions. Holcim operates across the Australian continent, supplying concrete from a network of concrete plants, quarries, precast and concrete pipe places, and mobile and on-site project facilities.
Phone
+61 2 9412 6600
Website
https://www.holcim.com.au Similar Products

Natural Sand
3.10
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
N/A
NABERS average

Customer Spec. Roadbase
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
below NABERS average

Dust
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
below NABERS average

Aggregate, Other Aggregates
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
below NABERS average

Concrete Aggregates
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
below NABERS average

Other Roadbase
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
below NABERS average

Drainage Filter Sand
6.50
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
N/A
NABERS average

Cement-treated Roadbase (0.5% cement)
Upfront Carbon Emissions
kg CO2e / unit (A1-A3)
kg CO2e / unit (A1-A3)
above NABERS average